About this property
4-bedroom villa, with construction scheduled to start in April 2024.
The villa will consist of 3 floors, configured as follows:
Floor -1: Garage (Basement)
-Garage for 4 cars;
Floor 0:
4-bedroom villa, with construction scheduled to start in April 2024.
The villa will consist of 3 floors, configured as follows:
Floor -1: Garage (Basement)
-Garage for 4 cars;
Floor 0:
Key features
We do not have this property's exact location, please ask Century 21 Realty Art Inove for further information